首页 | 本学科首页   官方微博 | 高级检索  
     

某办公大楼纠偏设计及施工方案
引用本文:侯建斌,卓庚山,赵立. 某办公大楼纠偏设计及施工方案[J]. 山西建筑, 2006, 32(10): 79-80
作者姓名:侯建斌  卓庚山  赵立
作者单位:山西岩土工程勘察总公司第四分公司
摘    要:结合台州某办公楼纠偏工程实例,对该楼所采用的纠偏设计思路做了介绍,并说明了设计和施工中应注意的一些问题,得出了该纠偏措施良好的结论,可供类似工程借鉴。

关 键 词:纠偏  沉井  锚杆静压桩
文章编号:1009-6825(2006)10-0079-02
收稿时间:2005-11-05
修稿时间:2005-11-05

Deviation rectification design and construction of one office building
HOU Jian-bin,ZHOU Geng-shan,ZHAO li. Deviation rectification design and construction of one office building[J]. Shanxi Architecture, 2006, 32(10): 79-80
Authors:HOU Jian-bin  ZHOU Geng-shan  ZHAO li
Affiliation:HOU Jian-bin ZHUO Geng-shan ZHAO Li
Abstract:Combined with deviation rectification design and construction work of one office building in Taizhou the ideas for deviation rectification design is introduced. The problems deserving attention in design and construction are also pointed out in order to provide references for similar works.
Keywords:deviation rectification   sunk well   static-bolt pile
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号