首页 | 本学科首页   官方微博 | 高级检索  
     

水电工程施工疲劳风险分析与量化评价研究
引用本文:江新,徐平,晋良海,黄华.水电工程施工疲劳风险分析与量化评价研究[J].长江科学院院报,2016,33(10):149-154.
作者姓名:江新  徐平  晋良海  黄华
作者单位:1.三峡大学 a.湖北省水电工程施工与管理重点实验室;b.水利与环境学院,湖北 宜昌 443002;2.中国电建集团 中南勘测设计研究院有限公司,湖北 宜昌 443002
基金项目:长江科学院开放研究基金资助项目(CKWV2016382/KY);国家自然科学基金项目(51379110);水电工程施工与管理湖北省重点实验室(三峡大学)开放基金资助项目(2016KSD20)
摘    要:为量化评估作业疲劳风险,提高施工作业安全水平,提出基于云模型改进的水电工程施工疲劳风险模糊综合评价方法。在评价过程中,利用云模型的3个数字特征Ex(期望)、En(熵),He(超熵)表征常规模糊综合评判法中的综合评判矩阵和权重矩阵;运用正态云模型代替模糊隶属度函数,计算疲劳风险发生的可能性等级;综合运用正向云及逆向云,可视化评价研究结果。用所建立的方法对某水电工程高边坡作业疲劳风险进行评估,结果表明,该水电工程的疲劳风险发生的可能性为5.419,处于“一般”等级,但明显偏向于风险“较大”等级。该评价方法综合考虑风险评估的随机性、模糊性及评价主体的主观性,为客观测量和及时预防水电施工作业疲劳风险提供一种行之有效的新方法。

关 键 词:水电工程施工  高危作业  云模型  疲劳风险  量化评价  
收稿时间:2015-11-27

Analysis and Quantitative Evaluation of Fatigue Risk in Hydropower Project Construction
JIANG Xin,XU Ping,JIN Liang-hai,HUANG Hua.Analysis and Quantitative Evaluation of Fatigue Risk in Hydropower Project Construction[J].Journal of Yangtze River Scientific Research Institute,2016,33(10):149-154.
Authors:JIANG Xin  XU Ping  JIN Liang-hai  HUANG Hua
Affiliation:1.Hubei Key Laboratory of Construction and Management in Hydropower Engineering, China Three GorgesUniversity, Yichang 443002, China;2.College of Hydraulic & Environmental Engineering, China ThreeGorges University, Yichang 443002,China;3. Power China Zhongnan Engineering Corporation Limited,Yichang 443002,China
Abstract:In the aim of quantifying the evaluation of construction fatigue risk and improving construction safety , a fuzzy comprehensive evaluation method improved by cloud model was proposed to assess the construction fatigue risk of high-risk operationsin hydropower project .Three digital features Ex, En, and He were taken to substitute the com-prehensive evaluation matrix and the weight matrix in traditional fuzzy comprehensive evaluation method .Fuzzy membership function was substituted by normal cloud model to calculate the ratings of risk possibility .The evalua-tion result was visualized by using forward and reverses clouds together .The method was applied to the evaluation of fatigue risk of high slope operations in a hydropower project .Results showed that the fatigue risk level of high slope operations is 5.419, which belongs to moderate risk but obviously closer to big risk .The randomness, fuzziness and subjectivity of the evaluation body are comprehensively considered by using this method .
Keywords:hydropower project construction  high-risk operations  cloud model  fatigue risk  quantitative evalua-tion
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《长江科学院院报》浏览原始摘要信息
点击此处可从《长江科学院院报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号