首页 | 本学科首页   官方微博 | 高级检索  
     

LNG海运航线配船优化模型
引用本文:牛东翔,高成男,谢新连,包甜甜.LNG海运航线配船优化模型[J].天然气工业,2015,35(9):101-104.
作者姓名:牛东翔  高成男  谢新连  包甜甜
作者单位:1.大连海事大学综合运输研究所;2.广东大鹏液化天然气有限公司
摘    要:航线配船是LNG海运制订船舶生产计划的中心环节,是一项复杂的优化决策工作,主要用于解决航运企业多型船舶在多条航线上的合理配置问题。为此,针对LNG海运稳定性要求高、计划性强、类似班轮运输的特点,结合大宗工业物资运输和班轮运输航线配船现代优化技术,以LNG船队年营运成本最小为目标,以货运量、时间、发船频率、船舶数量等指标为约束,构建了一个适应LNG海运的航线配船混合整数规划优化模型。为了进一步说明该优化模型在LNG航线配船中的实用性,针对某LNG运输公司的运力配置问题,利用LINGO 14.0优化软件进行了仿真算例分析。结果证明:其运力合理地投入到了所有航线上,整个船队的年营运成本控制在最小。结论认为,该优化模型简单可行,提出的配船方案能够满足LNG运输组织的实际需要,可为LNG航运企业的航线配船决策提供理论依据。


A fleet deployment optimization model for LNG shipping
Niu Dongxiang,Gao Chengnan,Xie Xinlian,Bao Tiantian.A fleet deployment optimization model for LNG shipping[J].Natural Gas Industry,2015,35(9):101-104.
Authors:Niu Dongxiang  Gao Chengnan  Xie Xinlian  Bao Tiantian
Affiliation:1.Integrated Transport Institute, Dalian Maritime University, Dalian, Liaoning 116026, China; 2.Guangdong Dapeng LNG Company Ltd., Shenzhen, Guangdong 518048, China
Abstract:As the central part of ship production plan for LNG shipping, fleet deployment is a complex optimization and decision program, which is mainly used to realize rational allocation of various ships on a number of routes. Based on the characteristics of LNG shipping (high stability requirement, strong planning and liner shipping similarity), a mixed integer programming optimization model for LNG shipping was built with the operation cost minimization as the aim and cargo quantity, time, frequency and ship quantity as the constrains, by means of the modern optimization technique of large-quantity industrial material transportation and liner transportation fleet deployment. In order to further explain the practicality of this model in the fleet deployment of LNG shipping, optimization platform LINGO 14.0 was used to conduct simulation analysis on the fleet deployment of a certain LNG shipping company. Results show that transport capacity is legitimately distributed on all routes and the whole operation cost is minimized. It is concluded that the optimization model is simple and feasible, and the proposed fleet deployment program can meet the needs of LNG shipping organization, so it can provide theoretical basis for the fleet deployment of LNG shipping companies.
Keywords:Fleet deployment  LNG shipping  LNG importing project  Capacity deployment  Optimization model  Mixed integer programming model  Minimum ship frequency  Simulation example  
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《天然气工业》浏览原始摘要信息
点击此处可从《天然气工业》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号