首页 | 本学科首页   官方微博 | 高级检索  
     

谈建设方项目成本管理
引用本文:吴世文.谈建设方项目成本管理[J].山西建筑,2011,37(32):217-219.
作者姓名:吴世文
作者单位:北京市顺义大龙城乡建设开发总公司,北京,101300
摘    要:结合工程项目建设流程,探讨了建设方项目成本管理方法,提出"三全管理"的概念,从项目调研、工程设计、合同签订、工程施工及决算等环节入手,阐述了全面成本控制的具体内容,以指导建设单位有效控制成本,提高效益。

关 键 词:建设单位  项目  成本管理  合同  材料供应

On costs management of constructors' programs
WU Shi-wen.On costs management of constructors' programs[J].Shanxi Architecture,2011,37(32):217-219.
Authors:WU Shi-wen
Abstract:Combining with the constructing procedures of the engineering programs,the paper explores the costs management methods of the constructors' programs,points out the concept of three-full-management,and illustrates the factual contents of the full costs control from the program investigation,the engineering design,the contract signing,the construction of the projects and the settlements,so as to direct the constructing parties to have the efficient costs control,and improve the efficiency.
Keywords:constructor  program  costs management  contract  material supply  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号