A multi-criteria approach for scheduling semiconductor wafer fabrication facilities |
| |
Authors: | Michele E. Pfund Hari Balasubramanian John W. Fowler Scott J. Mason Oliver Rose |
| |
Affiliation: | (1) Supply Chain Management Department, Arizona State University, Tempe, AZ 85287, USA;(2) Department of Health Sciences Research, Mayo Clinic, Rochester, MN 55905, USA;(3) Department of Industrial Engineering, Arizona State University, PO Box 875906, Tempe, AZ 85287-5906, USA;(4) Department of Industrial Engineering, University of Arkansas, 4207 Bell Engineering Center, Fayetteville, AR 72701, USA;(5) Institute for Applied Computer Science, Technical University of Dresden, 01062 Dresden, Germany |
| |
Abstract: | In this research, we model a semiconductor wafer fabrication process as a complex job shop, and adapt a Modified Shifting Bottleneck Heuristic (MSBH) to facilitate the multi-criteria optimization of makespan, cycle time, and total weighted tardiness using a desirability function. The desirability function is implemented at two different levels of the MSBH: the subproblem solution procedure level (SSP level) and the machine criticality measure level (MCM level). In addition, we suggest two different methods of choosing the critical toolgroup at the MCM level: (1) the Local MCM approach, which chooses the critical toolgroup based on local desirability values from the SSP level and (2) the Global MCM approach, which chooses the critical toolgroup based on its impact on the desirability of the entire disjunctive graph. Results demonstrate the desirability-based approaches’ ability to simultaneously minimize all three objectives. |
| |
Keywords: | Multicriteria Shifting bottleneck Complex job shop |
本文献已被 SpringerLink 等数据库收录! |
|