首页 | 本学科首页   官方微博 | 高级检索  
     

小净距隧道进口浅埋偏压段施工技术
引用本文:徐正齐,李海波. 小净距隧道进口浅埋偏压段施工技术[J]. 安徽建筑, 2007, 14(1): 26-27
作者姓名:徐正齐  李海波
作者单位:中铁四局集团第一工程有限公司,安徽,合肥,230041
摘    要:
文章通过工程实例,对小净距浅埋偏压隧道的地表加固、反压挡护、超前锚喷支护、中间岩柱加固、洞身开挖、监控量测等关键工序的施工方法和技术措施进行了探讨和总结。

关 键 词:小净距  浅埋偏压  施工技术
文章编号:1007-7359(2007)01-0026-02
修稿时间:2006-12-19

Technique Applied in the Short Clear-distance Tunnel Constructed by Shallow Foundation and Eccentric Compression
Xu Zhengqi,Li Haibo. Technique Applied in the Short Clear-distance Tunnel Constructed by Shallow Foundation and Eccentric Compression[J]. Anhui Architecture, 2007, 14(1): 26-27
Authors:Xu Zhengqi  Li Haibo
Affiliation:The First Engineering Co., Ltd. of CTCE Group, Hefei 230041, China
Abstract:
Through a project example,this paper makes approach and summary of the key construction methods and techniques,e.g.the consolidation of ground surface,reversed compression stopping,pre-bolt-spray support,strengthening of rock pillar amidst,excavation of culvert body,monitoring and surveying,used in the short clear-distance tunnel constructed by shallow foundation and eccentric compression.
Keywords:short clear distance  shallow foundation and eccentric compression  construction technique
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号