首页 | 本学科首页   官方微博 | 高级检索  
     


An optimal scheduling model for ready mixed concrete supply with overtime considerations
Authors:Shangyao Yan  Weishen Lai
Affiliation:

aDepartment of Civil Engineering, National Central University, Chungli 32001, Taiwan

Abstract:The incorporation of overtime considerations in the production and dispatching of ready mixed concrete (RMC) is a complex real world problem. In this research, the authors develop a network flow model for an RMC carrier according to Taiwan's operation situation, that integrates RMC production scheduling and truck dispatching in the same framework, to decide on an optimal RMC supply schedule which also integrates overtime considerations. To build the model, the authors employ a time–space network technique to formulate the production of RMC and the truck fleet flows in the dimensions of time and space. The model is formulated as a mixed integer network flow problem with side constraints. To efficiently solve the problem a solution algorithm incorporating a mathematical programming solver is developed. The network flow model and the solution method are then evaluated using real operating data. The test results show that the model and the solution algorithm could be useful for actual operations.
Keywords:Ready mixed concrete   Scheduling   Truck dispatching   Network   Overtime
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号