某水电站沉沙池方案比选设计研究
引用本文:黄蔚萍,薛瑞,陈东运. 某水电站沉沙池方案比选设计研究[J]. 西北水电, 2011, 0(5): 17-19
作者姓名:黄蔚萍  薛瑞  陈东运
作者单位:中国水电顾问集团西北勘测设计研究院,西安,710065
摘    要:根据某水电站泥沙基本资料,分析本工程设置沉沙池的必要性,类比同流域类似工程;结合地形地质条件和枢纽总体布置,对沉沙池布置方案进行比选,最终选择地下连续冲洗式沉沙池布置型式,并通过水力学计算,确定沉沙池主要控制尺寸。

关 键 词:地下沉沙池  连续冲洗式  方案  比选

Design and research on desilting basin alternatives for a hydropower project
HUANG Wei-ping,XUE Rui,CHEN Dong-yun. Design and research on desilting basin alternatives for a hydropower project[J]. Northwest Water Power, 2011, 0(5): 17-19
Authors:HUANG Wei-ping  XUE Rui  CHEN Dong-yun
Affiliation:HUANG Wei-ping,XUE Rui,CHEN Dong-yun(Hydrochina Xibei Engineering Corporation,CHECC,Xi'an 710065,China)
Abstract:Based on the basic sediment data,the paper analyzes the necessity of provision of desilting basin for the project and compares it with similar projects in the same catchment area.Then,according to the topographical and geological conditions and the project overall layout,the desilting basin layout alternatives are compared.Finally the underground continuous flushing-type desilting basin is selected,and its main controlling dimensions are determined through hydraulic calculation.
Keywords:underground desilting basin  continuous flushing-type  alternatives  comparison and selection  