首页 | 本学科首页   官方微博 | 高级检索  
     

无黏结环锚预应力混凝土衬砌张拉工艺研究
引用本文:皮进,王玉杰,齐文彪,曹瑞琅,赵宇飞,刘立鹏.无黏结环锚预应力混凝土衬砌张拉工艺研究[J].水利水电技术,2018,49(7):81-87.
作者姓名:皮进  王玉杰  齐文彪  曹瑞琅  赵宇飞  刘立鹏
作者单位:1. 中国水利水电科学研究院 流域水循环模拟与调控国家重点实验室,北京 100038; 2. 吉林省水利水电勘测设计研究院,吉林 长春 130021; 3. 福建省隧道与城市地下空间工程技术研究中心,福建 厦门 361021
基金项目:国家重点研发计划课题(2016YFC0401801,2016YFC0401804); 国家自然科学基金项目(51709282); 福建省隧道与城市地下空间 工程技术研究中心开放课题(17FTUE01)
摘    要:依托吉林省中部城市引松供水工程无黏结环锚预应力混凝土衬砌现场原位试验,对预应力衬砌张拉工艺进行了优化研究,提出了以单个衬砌浇筑块中部锚具槽为起点,两排锚具槽同时向两端进行张拉的张拉顺序,并根据张拉试验总结了4个张拉质量控制指标。现场张拉试验表明:优化后的张拉工艺与小浪底排沙洞工程相比,张拉效率得到了大幅提高,具有较大的经济效益。4个张拉质量控制指标不仅可以保证张拉质量,而且指标均可量化,实际操作简便易行,可为引松供水工程环锚衬砌后续施工及今后类似工程提供重要参考。

关 键 词:无黏结环锚  预应力衬砌  张拉工艺  水工隧洞  
收稿时间:2017-10-24

Tensioning technology of pre-stressed concrete lining with unbonded circular anchor
PI Jin,WANG Yujie,QI Wenbiao,et al.Tensioning technology of pre-stressed concrete lining with unbonded circular anchor[J].Water Resources and Hydropower Engineering,2018,49(7):81-87.
Authors:PI Jin  WANG Yujie  QI Wenbiao  
Affiliation:1. China State key Laboratory of Simulation and Regulation of Water Cycle in River Basin,China Institute of Water Resources and Hydropower Research,Beijing 100038,China; 2. Jilin Province Water Resources and Hydropower Consultative Company,Changchun 130021,Jilin,China; 3. Fujian Research Center for Tunneling and Urban Underground Space Engineering,Xiamen 361021,Fujian,China
Abstract:Based on the in-situ test of the pre-stressed concrete lining with unbonded annular anchor for Songhua River Water Conveyance Project for the cities in the central part of Jilin Province,the tensioning technology of pre-stressed lining is studied for its optimization,and then the tensioning sequence,i. e. taking the anchorage slots at the mid-part of single lining concrete placementblock as the starting points,from which tensionings are made to both the ends for two rows of anchorage slots at the same time,is put forward herein. Moreover,four tensioning quality control indexes are summarized according to the tensioning testas well. The in-situ test shows that the tensioning efficiency of the optimized tensioning technology is greatly improved with larger economic benefit if compared with that for the construction of the desilting tunnel for Xiaolangdi Water Control Project. The four tensioning quality control indexes can not only ensure the tensioning quality,but all of them can also be quantitized,which are convenient and practical and can provide important references for the succeeding construction of the pre-stressed concrete lining with unbonded annular anchor for Songhua River Water Conveyance Project and the similar project in the days to come.
Keywords:unbonded circular anchor  pre-stressed lining  tensioning technology  hydraulic tunnel  
本文献已被 CNKI 等数据库收录!
点击此处可从《水利水电技术》浏览原始摘要信息
点击此处可从《水利水电技术》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号