先简支后连续混凝土箱梁施工控制要点
引用本文:翟光耀,季凤飞. 先简支后连续混凝土箱梁施工控制要点[J]. 山西建筑, 2010, 36(22): 240-241
作者姓名:翟光耀  季凤飞
作者单位:临沂市公路局,山东临沂,276000
摘    要:结合先简支后连续混凝土箱梁的特点,对其施工过程中的控制要点进行了介绍,具体阐述了预应力混凝土箱梁预制,预应力张拉及压浆、现浇连续段施工及体系转换等环节的施工工艺及注意事项,以期促进箱梁结构形式的推广应用。

关 键 词:先简支后连续混凝土箱梁  预应力张拉  裂缝

The construction control points of simply supported to continuous concrete box beam
ZHAI Guang-yao,JI Feng-fei. The construction control points of simply supported to continuous concrete box beam[J]. Shanxi Architecture, 2010, 36(22): 240-241
Authors:ZHAI Guang-yao  JI Feng-fei
Affiliation:ZHAI Guang-yao JI Feng-fei
Abstract:Combined with simply supported to continuous concrete box beam characteristics,its construction process control points were introduced,the construction process and matters need attention prestressed concrete box beam prefabrication,prestress stretch and grouting,casting continuous construction and system conversion were detail illustrated,so as to promote box beam structure forming popularization.
Keywords:simply supported to continuous concrete box beam  prestressed stretch  crack