首页 | 本学科首页   官方微博 | 高级检索  
     


Optimisation model to schedule railway track renewal operations: a life-cycle cost approach
Abstract:
Besides high initial construction costs, ballasted railway tracks also have high investment requirements, related to maintenance and renewal (M&R) works. Decision support tools for railway track components that optimise these works are increasingly gaining in importance. This paper presents an optimisation model that integrates ballast, rail and sleeper degradation models in a mixed integer linear programming model. This model links the decisions to renew these components with their condition and takes advantage of the integrated planning of renewal works to minimise the railway track life-cycle cost (LCC). The practical utility of the model is illustrated with a case study involving the Portuguese Lisbon–Porto line. The results indicate a reduction in track renewal cost if the grouping of components, track segments and time interval for renewal operations are optimised. Furthermore, this paper demonstrates that possible annual budget restrictions for railway track M&R operations can have an important influence on the railway track LCC.
Keywords:railway track  opportunistic renewal scheduling  life-cycle cost assessment  optimisation
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号