首页 | 本学科首页   官方微博 | 高级检索  
     


Greedy algorithm for scheduling batch plants with sequence‐dependent changeovers
Authors:Pedro M. Castro  Iiro Harjunkoski  Ignacio E. Grossmann
Affiliation:1. Laboratório Nacional de Energia e Geologia, Unidade de Modela??o e Optimiza??o de Sistemas Energéticos, 1649‐038 Lisboa, Portugal;2. ABB Corporate Research Center, Wallstadter Str. 59, 68526 Ladenburg, Germany;3. Dept. of Chemical Engineering, Carnegie Mellon University, Pittsburgh, PA 15213
Abstract:This article presents a new algorithm for scheduling multistage batch plants with a large number of orders and sequence‐dependent changeovers. Such problems are either intractable when solved with full‐space approaches or poor solutions result. We use decomposition on the entire set of orders and derive the complete schedule in several iterations, by inserting a couple of orders at a time. The key idea is to allow for partial rescheduling without altering the main decisions in terms of unit assignments and sequencing (linked to the binary variables) so that the combinatorial complexity is kept at a manageable level. The algorithm has been implemented for three alternative continuous‐time mixed integer linear programing models and tested through the solution of 10 example problems for different decomposition settings. The results show that an industrial‐size scheduling problem with 50 orders, 17 units distributed over six stages can effectively be solved in roughly 6 min of computational time. © 2010 American Institute of Chemical Engineers AIChE J, 2011
Keywords:optimization  mathematical modeling  continuous‐time  resource‐task network
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号