首页 | 本学科首页   官方微博 | 高级检索  
     

单一采区工作面不同开采顺序地表沉陷模拟与复垦对策分析
引用本文:肖武,邵芳,李立平,张建勇,杨成兵.单一采区工作面不同开采顺序地表沉陷模拟与复垦对策分析[J].中国矿业,2015,24(4):53-57.
作者姓名:肖武  邵芳  李立平  张建勇  杨成兵
作者单位:中国矿业大学(北京)土地复垦与生态重建研究所;陕西国源科技工程有限公司。西安,;山东省济宁市国土资源局;山东省济宁市国土资源局,中国矿业大学北京土地复垦与生态重建研究所,陕西国源科技工程有限公司,中国矿业大学北京土地复垦与生态重建研究所,山东省济宁市国土资源局
基金项目:国土资源部公益性行业科研专项(200911015-03)中央高校基本科研业务费专项资金(2013QD03)资助Supported by the Fundamental Research Funds for the Central Universities(2013QD03)
摘    要:煤炭地下开采导致地面沉陷问题的出现,我国煤炭地下开采多以长臂开采,垮落式管理顶板的方式进行,地面土地损伤严重。地下工作面在不同开采顺序下虽然最终的沉陷形态一致,但是地面沉陷的过程及规律有所不同。对于井工煤矿边采边复而言,由于要在沉陷过程中采取复垦措施,因而对其动态沉陷过程进行模拟与分析很有必要。本文采用室内模拟方法,对单一采区的7个规则工作面在5种不同开采顺序下的地面沉陷过程与规律进行了分析,就5种开采顺序下的地面沉陷特征及复垦利弊进行了讨论。在此基础上,拓展分析总结得出了3类地质条件下的地下开采-地面复垦的耦合方案。

关 键 词:采区  边采边复  开采顺序  耦合  美丽矿区
收稿时间:2014/5/15 0:00:00
修稿时间:2/2/2015 12:00:00 AM

Mining subsidence simulation and reclamation strategy for different mining sequence for panels in underground coal mines
XIAO Wu,SHAO Fang,LI Liping,ZHANG Jianyong and YANG Chengbing.Mining subsidence simulation and reclamation strategy for different mining sequence for panels in underground coal mines[J].China Mining Magazine,2015,24(4):53-57.
Authors:XIAO Wu  SHAO Fang  LI Liping  ZHANG Jianyong and YANG Chengbing
Affiliation:Institute of Land Reclamation and Ecological Restoration,China University of Mining and Technology Beijing;China,Institute of Land Reclamation and Ecological Restoration, China University of Mining and Technology (Beijing),Shanxi GUOYUAN Technical Engineering company,Institute of Land Reclamation and Ecological Restoration, China University of Mining and Technology (Beijing),Jining Land burea in Shandong Province
Abstract:Ground subsidence was triggered by underground coal mining. In China, underground coal mining mainly employs longwall mining, and caving manages the roof. Thus, making land damage on the ground more serious. Even though the final subsidence trough were similar on the ground, when difference mining sequence implemented underground, the subsidence process and its disciplines were not the same. Concurrent mining and reclamation (CMR) technology, was to adapt reclamation measures on the ground, while subsidence occurring, or not occurred. Therefore, there has great significance to simulated and analyze the dynamic subsidence on the ground and its impact to land, while difference mining sequence were arranged. The study employs indoor simulation method, the 6 panels in a mining zone was simulated. 5 mining sequence was included, the subsidence process and laws were analyzed. Furthermore, reclamation strategies were discussed, respectively. Based on the simulation and analysis, 3 categories of underground mining and ground reclamation coupling model were summarized, considering the different geological and mining condition.
Keywords:mining area  concurrent mining and reclamation  mining sequence  coupling  beautiful mines
本文献已被 CNKI 等数据库收录!
点击此处可从《中国矿业》浏览原始摘要信息
点击此处可从《中国矿业》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号