首页 | 本学科首页   官方微博 | 高级检索  
     

计及灵活性提升的热电厂日前市场竞价策略
引用本文:章艳,吕泉,张娜,李杨,孙辉.计及灵活性提升的热电厂日前市场竞价策略[J].电力系统自动化,2021,45(6):140-147.
作者姓名:章艳  吕泉  张娜  李杨  孙辉
作者单位:大连理工大学电气工程学院,辽宁省大连市 116024;国网辽宁省电力有限公司经济技术研究院,辽宁省沈阳市 110015;华能大连电厂,辽宁省大连市 116113
基金项目:国家自然科学基金资助项目(51607021);中央高校基本科研业务费专项资金资助项目(DUT19JC33)。
摘    要:针对含多类型燃煤热电机组与多种电热解耦设备的热电厂在电力现货市场中的报价决策问题,提出了基于价格接受者角色的热-电分步决策竞价模型。首先,依据次日预测价格进行热电厂日前最优产量决策,确定厂内电热解耦设备的运行计划。然后,根据机组调节能力,计算热电厂在次日各时段的发电功率范围;进而,构建分段阶梯形报价曲线。最后,以中国北方地区某典型燃煤热电厂为例,基于现货市场试点的3种典型场景出清电价,验证了所提热-电分步竞价决策模型的有效性;同时分析结果表明,日前市场难以为燃煤热电厂灵活性提升改造提供足够的经济激励。

关 键 词:热电厂  日前现货市场  电热解耦  运行灵活性提升改造
收稿时间:2020/5/6 0:00:00
修稿时间:2020/6/28 0:00:00

Bidding Strategy of Day-ahead Market for Combined Heat and Power Plant Considering Flexibility Improvement
ZHANG Yan,LYU Quan,ZHANG Na,LI Yang,SUN Hui.Bidding Strategy of Day-ahead Market for Combined Heat and Power Plant Considering Flexibility Improvement[J].Automation of Electric Power Systems,2021,45(6):140-147.
Authors:ZHANG Yan  LYU Quan  ZHANG Na  LI Yang  SUN Hui
Affiliation:1.School of Electrical Engineering, Dalian University of Technology, Dalian 116024, China;2.Institute of Economics and Technology of State Grid Liaoning Electric Power Co., Ltd., Shenyang 110015, China;3.Huaneng Dalian Power Plant, Dalian 116113, China
Abstract:To deal with the bidding decision-making issues of combined heat and power (CHP) plants with multiple types of coal-fired CHP units and various heat and power decoupling equipment in day-ahead spot markets, a heat-power step-by-step decision-making bidding model is proposed for a plant acting as a price taker. First, the optimal day-ahead power output of the CHP plants and the operation plan of heat and power decoupling equipment are determined based on the forecasting day-ahead prices. Then, the generation power ranges of CHP plants in each time period of the next day are determined according to the regulation capability of CHP units. A stepwise quotation curve is constructed. Finally,taking a typical CHP plant in northern China as an example, the effectiveness of the heat-power step-by-step bidding model is verified based on the clearing prices of three typical scenarios in a pilot spot market. Meanwhile, simulation results show that the day-ahead spot market cannot provide sufficient economic incentives for the operation flexibility improvement and renovation of CHP plants.
Keywords:combined heat and power plant  day-ahead spot market  heat and power decoupling  operation flexibility improvement
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《电力系统自动化》浏览原始摘要信息
点击此处可从《电力系统自动化》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号