丹江口工程左联坝段加高混凝土施工
引用本文:宋仁莉. 丹江口工程左联坝段加高混凝土施工[J]. 湖北水力发电, 2008, 0(1): 23-27
作者姓名:宋仁莉
作者单位:葛洲坝集团第二工程有限公司,湖北,宜昌,443002
摘    要:
介绍丹江口大坝加高左岸第二个枯水期混凝土施工特点,及对其重点和难点所采取的措施,其中着重介绍新老混凝土结合面处理。

关 键 词:丹江口大坝  大坝加高  左联坝段  施工
文章编号:1671-3354(2008)01-023-05
修稿时间:2007-11-05

Concrete construction of left dam blocks heightening of Danjiangkou Hydroproject
SONG Renli. Concrete construction of left dam blocks heightening of Danjiangkou Hydroproject[J]. Hubei Water Power, 2008, 0(1): 23-27
Authors:SONG Renli
Affiliation:SONG Renli(Gezhouba Group 2nd Engineering Co.,Ltd,Yichang 443002,China)
Abstract:
The particularities of concrete construction in left dam blocks heightening works of Danjiangkou Hydroproject in second low-water season are described;the measures to deal with the major technical difficulties such as the bonding of fresh concrete with old concrete are discussed.
Keywords:Danjiangkou Dam  dam heightening  left dam blocks  construction  