首页 | 本学科首页   官方微博 | 高级检索  
     


A simulation analysis of sequencing rules for ASRS in a pull-based assembly facility
Authors:R J LINN  XIAODONG XIE
Affiliation:1. Department of Industrial and Manufacturing Systems Engineering , Iowa State University , Ames , IA , 50011 , USA;2. School of Industrial and Systems Engineering, Georgia Institute of Technology , Atlanta , GA , 30332 , USA
Abstract:Just-in-time (JIT) systems operate on a pull-based production control. The material needed is expected to be at its production site when and only when it is needed. When an automated storage retrieval system (ASRS) is used as a valve warehouse to support JIT manufacturing, the delivery time becomes critical. This paper presents an investigation on the effect of job sequencing rule on delivery performance of an ASRS, which is used as a valve warehouse to support a pull-based Kanban-driven assembly line. The analysis was based on computer simulation. The interaction of the sequencing rules with other control variables was also examined
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号