A heuristic for scheduling in flowshop and flowline-based manufacturing cell with multi-criteria |
| |
Authors: | C. RAJENDRAN |
| |
Affiliation: | Division of Industrial Engineering and Management, Department of Humanities and Social Sciences , Indian Institute of Technology , Madras, 600 036, India |
| |
Abstract: | ![]() The problem of scheduling in flowshop and flowline-based manufacturing cell is considered with the bicriteria of minimizing makespan and total flowtime of jobs, The formulation of the scheduling problems for both the flowshop and the flowline-based manufacturing cell is first discussed. We then present the development of the proposed heuristic for flowshop scheduling. A heuristic preference relation is developed as the basis for the heuristic so that only the potential job interchanges are checked for possible improvement with respect to bicriteria, The proposed heuristic algorithm as well as the existing heuristic are evaluated in a large number of randomly generated large-sized flowshop problems. We also investigate the effectiveness of these heuristics with respect to the objective of minimizing total machine idletime. We then modify the proposed heuristic for scheduling in a cell, and evaluate its performance. |
| |
Keywords: | |
|
|