Performability of automated manufacturing systems with centralized material handling |
| |
Authors: | R. RAM N. VISWANADHAMJ |
| |
Affiliation: | 1. Center for Development of Telematics , 4th Floor, Sneha Complex, 71/1 Miller Road, Bangalore, 560 052, India;2. Department of Computer Science and Automation , Indian Institute of Science , Bangalore, 560 012, India |
| |
Abstract: | ![]() We present a framework for performance evaluation of manufacturing systems subject to failure and repair. In particular, we determine the mean and variance of accumulated production over a specified time frame and show the usefulness of these results in system design and in evaluating operational policies for manufacturing systems. We extend this analysis for lead time as well. A detailed performability study is carried out for the generic model of a manufacturing system with centralized material handling. Several numerical results are presented, and the relevance of performability analysis in resolving system design issues is highlighted. Specific problems addressed include computing the distribution of total production over a shift period, determining the shift length necessary to deliver a given production target with a desired probability, and obtaining the distribution of Manufacturing Lead Time, all in the face of potential subsystem failures. |
| |
Keywords: | |
|
|