首页 | 本学科首页   官方微博 | 高级检索  
     


Optimum loading for GT/MRP manufacturing systems
Authors:F. Choobineh
Affiliation:

Department of Industrial Engineering, University of Nebraska-Lincoln, NE 68588, U.S.A.

Abstract:A hierarchical planning procedure to utilize the potential advantages of coexistence of Group Technology (GT) and Material Requirement Planning (MRP) systems is presented. In addition, a multi-period linear programming model is proposed to determine the minimum cost loading schedule of manufacturing cells used in batch production environment. The proposed model provides the optimum work force for each cell over the planning horizon.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号