湘钢新2号2580m~3高炉开炉及达产实践
引用本文:张宇,左国红,苏波,周少丰.湘钢新2号2580m~3高炉开炉及达产实践[J].南方金属,2011(2):56-58.
作者姓名:张宇  左国红  苏波  周少丰
作者单位:1. 华菱湘潭钢铁有限公司,湖南,湘潭,411101
2. 中冶南方工程技术有限公司,湖北,武汉,430223
摘    要:对湘钢新2号2 580 m3高炉开炉及达产的操作经验进行了总结.通过抓好设备质量和开炉工作准备以及合理的开炉方案制定,实现了安全顺利开炉和快速达产.

关 键 词:大型高炉  开炉  达产

Commissioning and achievement of the target output for the new No.2 BF at Xiangtan Iron and Steel Group Co.,Ltd.
ZHANG Yu,ZUO Guo-hong,SU Bo,ZHOU Shao-feng.Commissioning and achievement of the target output for the new No.2 BF at Xiangtan Iron and Steel Group Co.,Ltd.[J].Southern Metals,2011(2):56-58.
Authors:ZHANG Yu  ZUO Guo-hong  SU Bo  ZHOU Shao-feng
Affiliation:ZHANG Yu1,ZUO Guo-hong1,SU Bo1,ZHOU Shao-feng2 (1.Valin Xiangtan Iron and Steel Co.,Ltd.,Xiangtan 41110,Hunan,2.WISDRI Engineering & Research Incorporation Ltd.,Wuhan 430223,Hubei)
Abstract:The experiences of the commissioning and achievement of the target output for the new,2 580 m3 No.2 blast furnace at Xiangtan Iron and Steel Group Co.,Ltd are summarized in the paper.By ensuring a good equipment quality,and implementing an elaborative start-up preparation,the blast furnace started up smoothly and safely,and attained the target output soon afterwards.
Keywords:large sized blast furnace  commissioning  achievement of target output  