On an exact method for the constrained shortest path problem |
| |
Authors: | Leonardo Lozano,André s L. Medaglia |
| |
Affiliation: | Centro para la Optimización y Probabilidad Aplicada (COPA), Departamento de Ingeniería Industrial, Universidad de los Andes, Cr 1E No. 19A-10, ML711, Bogotá, Colombia |
| |
Abstract: | The constrained shortest path (CSP) is a well known NP-Hard problem. Besides from its straightforward application as a network problem, the CSP is also used as a building block under column-generation solution methods for crew scheduling and crew rostering problems. We propose an exact solution method for the CSP capable of handling large-scale networks in a reasonable amount of time. We compared our approach with three different state-of-the-art algorithms for the CSP and found optimal solutions on networks with up to 40,000 nodes and 800,000 arcs. We extended the algorithm to effectively solve the auxiliary problems of a multi-activity shift scheduling problem and a bus rapid transit route design problem tackled with column generation. We obtained significant speedups against alternative column generation schemes that solve the auxiliary problem with state-of-the-art commercial (linear) optimizers. We also present a first parallel version of our algorithm that shows promising results. |
| |
Keywords: | Constrained shortest path Shortest path problem Column generation |
本文献已被 ScienceDirect 等数据库收录! |
|