水布垭大坝总渗流量突变成因分析
引用本文:胡鸣晖,周玉红.水布垭大坝总渗流量突变成因分析[J].湖北水力发电,2013(6):50-53.
作者姓名:胡鸣晖  周玉红
作者单位:湖北清江水电开发有限责任公司,湖北宜昌443000
摘    要:介绍了水布垭水电站大坝加密监测及巡视检查的情况,从监测资料、巡视检查的角度,对坝体总渗流量2012年4月发生突变的情况进行了综合分析,分析成果为水布垭水电站安全稳定运行提供了依据。

关 键 词:水布垭大坝  量水堰  渗流量  突变  渗流分析

Cause Analysis of the Seepage Flow Mutation of Shuibuya Dam
HU Minghui,ZHOU Yuhong.Cause Analysis of the Seepage Flow Mutation of Shuibuya Dam[J].Hubei Water Power,2013(6):50-53.
Authors:HU Minghui  ZHOU Yuhong
Affiliation:( Hubei Qingjiang Hydroelectric Development Co. , Ltd. , Yichang 443000, China)
Abstract:The dam intensive monitoring and inspection of Shuibuya Hydropower Station is introduced. The mutation of total seepage flow of dam body occurred in April,2012 is analyzed from the perspectives of monitoring data and inspection,which provides the basis for the safe and stable operation of Shuibuya Hydropower Station.
Keywords:Shuibuya dam  measuring weir  seepage discharge  mutation  seepage analysis