首页 | 本学科首页   官方微博 | 高级检索  
     

软岩大跨隧道施工技术探讨
引用本文:李福勇.软岩大跨隧道施工技术探讨[J].山西建筑,2009,35(5).
作者姓名:李福勇
作者单位:中铁二十局集团第四工程有限公司,山东,青岛,266061
摘    要:指出了软岩大跨隧道较多采用中壁法和双侧壁导坑法,介绍了在新羊石隧道中采用环形开挖预留核心土法,并采取了强支护、辅助施工方法、监控量测、快速施工、合理布距、动态管理等保证措施,以达到快速、安全、经济的施工效果.

关 键 词:软岩  大跨  隧道  环形开挖预留核心土法

Study on construction technology of soft rock long span tunnel
LI Fu-yong.Study on construction technology of soft rock long span tunnel[J].Shanxi Architecture,2009,35(5).
Authors:LI Fu-yong
Abstract:The author points out that the center diaphragms and the two side-wall pilot tunnel are mostly used in the soft rock long span tunnel,introduces the ring type excavation with conservation of core soil used in the new Yangshi tunnel,and uses the guarantee measures of the strong support,the assisting construction,the monitoring measurement,the rapid construction,the rational distribution and the dynamic management to achieve the rapid,safe,economic construction effect.
Keywords:soft rock  long span  tunnel  ring type excavation with conservation of core soil  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号