首页 | 本学科首页   官方微博 | 高级检索  
     

深埋圆形隧道的压力拱研究
引用本文:王迎超,严细水,靖洪文,蔚立元,牟泰安. 深埋圆形隧道的压力拱研究[J]. 地下空间与工程学报, 2012, 8(5): 910-915
作者姓名:王迎超  严细水  靖洪文  蔚立元  牟泰安
作者单位:1.中国矿业大学力学与建筑工程学院,江苏 徐州 221008;2.中国矿业大学深部岩土力学与地下工程国家重点实验室,江苏 徐州 221008;3.浙江大学建筑工程学院,杭州 310058
基金项目:中国博士后科学基金(20110491475);江苏省博士后科研资助计划项目(1101017B);国家自然科学基金(51074162,51134001,51174197,51109209);深部岩土力学与地下工程国家重点实验室博士后基金(PD1105);中国矿业大学力建学院青年科技基金(lj2010qnjj03);国家大学生创新创业训练计划项目;中国矿业大学人才引进资助项目
摘    要:
针对压力拱存在概念不明确的问题,阐述了隧道中压力拱的概念,指出压力拱是一条受压的曲线,隧道开挖后会形成一次开挖压力拱,当围岩出现拉应力时会导致二次开挖压力拱出现。然后,在现有深埋圆形隧道解析解基础上,将地应力分为静水压力、双向常应力、与深度成正比三种情况进行压力拱分析。研究结果表明:对于地应力为静水压力情况,一次压力拱和隧道的轮廓线重合;对于地应力为双向常应力情况,一次压力拱和水平与竖向应力比有关,还和受拉判断标准有关,当竖向应力是水平应力的3倍以上时,拱顶将产生拉应力,且压力拱和隧道轮廓线间的受拉体随其值的增大而增大;对于地应力与深度成正比情况,一次压力拱的特性和地应力为双向常应力情况类似,隧道顶部受拉时的水平地应力与竖向地应力比值要小于0.2。从工程安全角度考虑,压力拱宜以最小主应力受拉为判断标准。

关 键 词:压力拱  圆形隧道  地应力  判断标准  
收稿时间:2012-06-13

Study on Pressure-Arch of Deep Circular Tunnel
Wang Yingchao,Yan Xishui,Jing Hongwen,Yu Liyuan,Mou Taian. Study on Pressure-Arch of Deep Circular Tunnel[J]. Chinese Journal of Underground Space and Engineering, 2012, 8(5): 910-915
Authors:Wang Yingchao  Yan Xishui  Jing Hongwen  Yu Liyuan  Mou Taian
Affiliation:1.School of Mechanics Civil Engineering, China University of Mining Technology, Xuzhou, Jiansu 221008, China; 2.State Key Laboratory for Geomechanics and Deep Underground Engineering, China University of Mining Technology, Xuzhou, Jiangsu 221008, China; 3.College of Civil Engineering and Architecture,Zhejiang University,Hangzhou 310058,China
Abstract:
According to the problem that the conception of pressure-arch is undefined, the conception of pressure-arch in tunnel is described. It is pointed out that the pressure-arch is a compressive curve. First pressure-arch can be formed when tunnel is excavated. The first pressure-arch will result in the secondary pressure-arch when the surrounding rock generated tension stress. Then, according to the existing analytic stress solution of deep circular tunnel, the ground stress is classified into three cases to analyze the pressure-arch. Firstly, the ground stress is a hydrostatic-pressure, the first pressure-arch is the contour of circular tunnel. Secondly, the ground stress is bidirectional constant, the first pressure-arch is related not only to the initial stress ratio between horizontal and vertical stresses but also to the tension stress criterion. Tensile stress will occur in vault of the tunnel when initial stress ratio between vertical and horizontal stresses is more than three. Tension area between pressure-arch and the contour of circular tunnel increases with initial stress ratio between vertical and horizontal ones. Thirdly, when the ground stress is proportional to the depth, the characteristic of first pressure-arch is similar to that in second case. Tensile stress will occur in vault of the tunnel when initial stress ratio between horizontal and vertical ones is less than 0.2. Considering the engineering safety, for the judging criterion the minimum principal stress in tension should be selected to analyze the pressure-arch.
Keywords:pressure-arch  circular tunnel  ground stress,judging criteria,
本文献已被 CNKI 等数据库收录!
点击此处可从《地下空间与工程学报》浏览原始摘要信息
点击此处可从《地下空间与工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号