凌津滩水电站坝体横缝漏水化学灌浆处理
引用本文:涂建湘,周剑桥. 凌津滩水电站坝体横缝漏水化学灌浆处理[J]. 长江科学院院报, 2000, 17(6): 76-77
作者姓名:涂建湘  周剑桥
作者单位:中国水利水电第八工程局,基础工程分局,湖南,长沙,410118;中国水利水电第八工程局,基础工程分局,湖南,长沙,410118
摘    要:凌津滩水电站二期工程,其坝体横缝止水片附近混凝土因浇捣不密实,出现脱空现象,灌浆廊道内坝体横缝漏水。经采用化学灌浆方法对漏水缝及点进行止水处理,检查结果表明效果良好。

关 键 词:坝体横缝  化学灌浆  水溶性聚氨酯

Chemical Grouting Treatment to Leakage in Transverse Joints inside Dam Body of Lingjintan Hydropower Station
TU Jian-xiang,ZHOU Jian-qiao. Chemical Grouting Treatment to Leakage in Transverse Joints inside Dam Body of Lingjintan Hydropower Station[J]. Journal of Yangtze River Scientific Research Institute, 2000, 17(6): 76-77
Authors:TU Jian-xiang  ZHOU Jian-qiao
Abstract:Due to insufficient vibrating compaction in concrete pouring ,there occurred cavity pockets in the concrete near the copper sheet seal in the transverse joints inside the dam body of 2nd stage project of Lingjintan Hydropwer Station.Through the sealing treatment of the leakage joints and points by using chemical grouting ,it was approved that the method is quite effective.
Keywords:transverse joints in dam body  chemical grouting  water soluble polyurethane  