二郎坝水电站调速器技术改造
引用本文:陈自贵,陈亮,宋汉平.二郎坝水电站调速器技术改造[J].电网与水力发电进展,2005,21(4):11-14.
作者姓名:陈自贵  陈亮  宋汉平
作者单位:二郎坝水力发电公司 陕西宁强714200
摘    要:二郎坝水电站调速器更新改造采用“电气调节器+步进式机液随动”调速器系统结构,选择单片微控制器为核心的YW T-H微机调节器,硬件结构紧凑、检修维护方便。改造后的调速器工作性能稳定可靠。该调速器改造方案特别适用于中小型调速器的更新改造。

关 键 词:调速器  技术改造  步进式  单片微控制器
文章编号:1671-4768(2005)04-0011-04
修稿时间:2005年10月14

Governor Technical Renewed in Erlangba Hydropower Station
Authors:CHEN Zi-gui  CHEN Liang  SONG Han-ping
Abstract:The system structure composed of"Electrical-adjustor + stepped-fluid-drive-servo" was been adopted in Erlangba waterpower station for the governors renewed,with YWT-H adjustor based on single-chip micro-controller as a core.The hardware structure was compacted,and was convenient for inspection and maintenance.It was shown by real operation results that renewed governor has high stability;with all kinds of index meet the GB9652 standard.The developed system was simple and stable,especially would be applied in middle and small governor renewed.
Keywords:governor  renewed by technique  stepped  single-chip micro-controllerchip micro-controller