摘    要:万浩俪城S1工程东北边缘毗邻国家电网河东110 kV变电站,考虑到基坑周围环境的复杂性与支护工程的安全经济性,采取分段计算分析的方法,运用理正深基坑软件进行支护方案设计的计算.其中,Ⅰ段,基坑边缘距变电站2.0m,对土体变形敏感,空间狭窄无法放坡开挖,且土钉墙不能满足侧壁安全要求,选用桩锚支护结构;Ⅱ段周边为道路及开阔空地,采用放坡土钉墙支护结构.计算结果表明:桩锚支护段整体稳定性、抗倾覆、抗隆起等各项参数,放坡土钉墙支护段局部抗拉、内外部稳定性等参数,均满足规范要求,总体设计方案技术可行、合理经济.

关 键 词:基坑工程  毗邻建筑物  桩锚支护  理正深基坑软件
收稿时间:2012/7/17 0:00:00

The scheme design and analysis about the deep foundation pit support of Wan Hao Li Cheng Sengineering
Authors:ZHANG Li-zhao  GUAN Ying-bin  ZHANG Wei  Li Li-fei and XU Dao-jun
Affiliation:College of Resource, Hebei University of Engineering, Hebei Handan 056038, China;College of Resource, Hebei University of Engineering, Hebei Handan 056038, China;College of Resource, Hebei University of Engineering, Hebei Handan 056038, China;College of Resource, Hebei University of Engineering, Hebei Handan 056038, China;College of Resource, Hebei University of Engineering, Hebei Handan 056038, China
Abstract:The northeast edge of Wan HaoSubstation of the State Grid,considering theLi Cheng S Engineering is adjacent to Hedong 110 kVcomplexity of surrounding environment and the safety andeconomic of the support engineering,the supporting scheme was computed by using the subsectionmethod and 1izheng deep foundation pit software.The edge of jsegment pit,which is 2.0 metersaway from the substation,is sensitive to soil deformation,the narrow space can not stepslope excavate,and soil nailing wall can not meet the security requirements of the lateral wall,thus,the pileanchor retaining structure is selected;the surroundings of B segment are roads and extensive spaces,the stepslope bility of the pile soil nailing wall supporting structure is adopted.The results show that,the global staanchor retaining segment like local and various parameters such as antioverturning and resistant heave;and the parameterstensile and internal and external stability of the stepslope soil nailing wall supporting segment all meet the requirements of specifications,the whole designschemes is feasible.reasonable andeconomic.
Keywords:retaining and protecting for foundation excavation  pile-anchor retaining  li-Zheng deep foundation software  design and analysis