首页 | 本学科首页   官方微博 | 高级检索  
     

山西省泽城西安水电站工程坝基混凝土防渗墙的施工工艺
引用本文:王学强,刘艳明.山西省泽城西安水电站工程坝基混凝土防渗墙的施工工艺[J].山西水利科技,2012(4):24-26.
作者姓名:王学强  刘艳明
作者单位:1. 山西泽城西安水电有限公司,山西太原,030002
2. 山西省水利建筑工程局,山西太原,030006
摘    要:为了减少坝基渗漏,泽城西安水电站工程混凝土面板堆石坝的坝基设置了混凝土防渗墙。墙长191.50m,墙厚1.0m,最大墙深52m。文中叙述了防渗墙施工的总体布置,防渗墙施工方法及其在施工过程中的质量控制。

关 键 词:混凝土防渗墙  泥浆配合比  造孔  质量控制

Construction Technique of Concrete Diaphragm Wall in Dam Foundation of Zecheng Xi'an Hydroelectric Station Project
WANG Xue-qiang,LIU Yan-ming.Construction Technique of Concrete Diaphragm Wall in Dam Foundation of Zecheng Xi'an Hydroelectric Station Project[J].Shanxi Hydrotechnics,2012(4):24-26.
Authors:WANG Xue-qiang  LIU Yan-ming
Affiliation:WANG Xue-qiang LIU Yan-ming
Abstract:In order to control the seepage through foundation of reinforced concrete facing rockfill dam in Zecheng Xi'an Hydroelectric Station Project , the concrete diaphragm wall is set up in dam foundation . The total length of wall is 191.5m , its thickness is 1 m , and the maximum depth is 52m . The paper states the construction general layout for building this wall, its detailed construction technique and quality control in the whole construction process.
Keywords:concrete diaphragm wall  mud mix proportion  making hole  quality control
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号