唐河水电站堆石坝基础处理与堆石料填筑施工
引用本文:王建.唐河水电站堆石坝基础处理与堆石料填筑施工[J].山西水利科技,2012(4):55-56.
作者姓名:王建
作者单位:山西省水利建筑工程局,山西太原,030006
摘    要:唐河水电站的坝型是混凝土面板堆石坝,坝高26.9m,坝顶长度280.5m。文中叙述了坝基处理、坝体碾压试验及筑坝的方法。

关 键 词:混凝土面板堆石坝  基础处理  碾压试验  坝体填筑

Treating Dam Foundation and Filling Dam Body of Tanghe Hydroelectric Station's Rock-fill Dam with Concrete Face Slab
WANG Jian.Treating Dam Foundation and Filling Dam Body of Tanghe Hydroelectric Station's Rock-fill Dam with Concrete Face Slab[J].Shanxi Hydrotechnics,2012(4):55-56.
Authors:WANG Jian
Abstract:The dam type of Tanghe Hydroelectric Station is rock-fill dam with concrete face slab. Its dam height is 26.9m, and its length of dam top is 280.5m. In this paper, the treating dam foundation , the rolling test of dam body and the method of constructing dam are introduced.
Keywords:rock-fill dam with concrete face slab  foundation treatment  rolling test  constructing dam