首页 | 本学科首页   官方微博 | 高级检索  
     

基于清单计价模式下工程造价控制
引用本文:云常富.基于清单计价模式下工程造价控制[J].城市建筑,2013(22):186-186,193.
作者姓名:云常富
作者单位:辽宁公信工程造价咨询有限责任公司,110021
摘    要:推行工程量清单计价模式是我国建筑行业与国际接轨重要体现,清单计价模式的实施不仅提高了工程建设的管理水平,更是促进了我国工程造价的改革。本文从工程建设的设计、招投标、施工与竣工四个阶段分析清单计价模式下如何控制工程造价,希望可以给同行人员一些借鉴,仅供参考。

关 键 词:清单计价模式  工程造价  设计  施工  竣工

Project Cost Control under the List Price Model
Yun Changfu.Project Cost Control under the List Price Model[J].Urbanism and Architecture,2013(22):186-186,193.
Authors:Yun Changfu
Affiliation:Yun Changfu
Abstract:Carrying out engineering quantity list valuation mode is an important manifestation of China’s construction industry integrated with the international market. The implementation of list valuation mode not only improves the management level of the project construction, and also promotes the reform of China’s engineering cost. In this paper, from the four stages of design, construction bidding, construction and completion it analyzes under the list price model how to control the engineering cost, hopes can give peer personnel reference, for reference only.
Keywords:list price model  engineering cost  design  construction  completion
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号