首页 | 本学科首页   官方微博 | 高级检索  
     

工程建设风险管理研究
引用本文:李尚革,袁大祥. 工程建设风险管理研究[J]. 江苏建材, 2008, 0(4): 59-61
作者姓名:李尚革  袁大祥
作者单位:三峡大学经济与管理学院,湖北,宜昌,443002
摘    要:
利用合理的风险分解结构,分析项目风险源;采用风险发生链分析,使逻辑关系更清晰。根据期望值E,标准离差δ和变异系数CV做出风险预测;采用项目特征图、风险重要性排序和组合折现率法进行风险分析。最后结合国际上常用风险应对策略提出进行风险控制的措施。

关 键 词:工程建设  风险管理  风险分解结构

Research on risk management in the project construction
Li Shangge,Yuan Daxiang. Research on risk management in the project construction[J]. , 2008, 0(4): 59-61
Authors:Li Shangge  Yuan Daxiang
Abstract:
Utilizing reasonable risk breakdown structure, the fundamental risks are identified. The analysis of the risk chain is used to make the logical relations more clear and risk evaluation is developed by expectation value (E), standard deviate (δ) and variation coefficient (CV). Risk analysis is based on the project risk profile, risk important order and adjusted discounting rate. At last, risk control is linked to the usual international risk countermeasures.
Keywords:project construction  risk management  risk breakdown structure  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号