基于动态规划的水电站机组间负荷分配程序开发
引用本文:吾买尔·吐尔逊,塔义尔·肉孜,夏庆成,岳春芳,夏克尔江·艾尼.基于动态规划的水电站机组间负荷分配程序开发[J].人民长江,2012,43(1):80-82.
作者姓名:吾买尔·吐尔逊  塔义尔·肉孜  夏庆成  岳春芳  夏克尔江·艾尼
作者单位:1. 新疆农业大学水利与土木工程学院,新疆乌鲁木齐,830052
2. 吐鲁番水文水资源勘测局,新疆吐鲁番,838000
基金项目:新疆农业大学前期资助课题,新疆水利水电工程重点学科基金资助项目
摘    要:水电站机组间负荷分配计算中的阶段变量与状态变量的个数越多,计算量就越大,且计算程序也越复杂,因而仅用手工计算很难做到。为此,利用动态规划法建立了水电站厂内经济运行流量分配数学模型。使用编程软件Visual Basic开发了水电站机组间负荷分配程序;该程序界面友好,使用方便,且能大大提高计算速度。应用该程序,对水电站机组间的负荷分配进行了实际应用计算,得出了经济效益最优的负荷分配方案。

关 键 词:动态规划  Visual  Basic  负荷分配  水电站

Program development of load distribution among hydropower units based on dynamic programming
WUMAIER Tuerxun , TAYIER Rouzi , XIA Qingcheng , YUE Chunfang , XIAKEERJIANG Aini.Program development of load distribution among hydropower units based on dynamic programming[J].Yangtze River,2012,43(1):80-82.
Authors:WUMAIER Tuerxun  TAYIER Rouzi  XIA Qingcheng  YUE Chunfang  XIAKEERJIANG Aini
Affiliation:WUMAIER Tuerxun1,TAYIER Rouzi1,XIA Qingcheng1,YUE Chunfang1,XIAKEERJIANG Aini2(1.College of Water Conservancy and Civil Engineering,Xinjiang Agricultural University,Urumqi 830052,China;2.Turpan Prefecture Bureau of Hydrology and Water Resources Survey,Turpan 838000,China)
Abstract:In order to simplify the calculations on the load distribution among hydropower units,which are characterized by more variables of operating stage and state,complex in computation and unconceivable in manual calculation,a mathematical model was established for the distribution of economic operation flow in a hydroelectric plant based on dynamic programming.A load distribution program for the hydropower units was developed by Visual Basic,with convenience in use,friendly interface and higher speed of computation.An optimal economic scheme has been obtained through the practical application of this program.
Keywords:dynamic programming  Visual Basic  load distribution  hydropower station