首页 | 本学科首页   官方微博 | 高级检索  
     

长江流域“八五”水利建设分析
引用本文:廖方炳,王新才.长江流域“八五”水利建设分析[J].人民长江,1995,26(9):68-72.
作者姓名:廖方炳  王新才
作者单位:长江水利委员会计划局,长江水利委员会计划局统计综合处
摘    要:“八五”期间,由于各级政府用全社会对水利重要地位和作用认识不断加强和水利投资的增加,推动了大江大河的治理及骨干工程建设,加快了水电及区域电网的建设步伐,促进了农村水利和城乡供水工程的发展,在防洪除涝工程、河道整治、农田水利、水力发电、水资源开发利用、水土保持、水利投资、工程管理等方面,都取得了显著的成绩,但也存在许多亟待解决的问题。在对“八五”期间水利建设全面总结的基础上,论述了长江流域水利发展占

关 键 词:水电资源  开发规划  长江流域

Analysis for Yangtze valley water conservancy construction during 8th 5-year plan
Liao Fangbing, Wang Xincai.Analysis for Yangtze valley water conservancy construction during 8th 5-year plan[J].Yangtze River,1995,26(9):68-72.
Authors:Liao Fangbing  Wang Xincai
Affiliation:Liao Fangbing; Wang Xincai
Abstract:During 8th 5-year national economy development plan, much attention was paid by governments at all levels and whole Chinese society to the water conservancy construction,and the funds for it were also increased;which have pushed the harnessing of large rivers and streams and the construction of backbone projects,speeded up the constructional pace of the hydropower project and regional electric network,promoted the irrigation as well as rural and urban water supply development. Remarkable achievements have been attained in aspects such as the flood control, water logging control, river regulation, irrigation, hydropower generation, soil and water conservation, and engineering management. However,there exist many problens to be solved in the water conservancy construction. Based on fully summing up the experience in the water conservancy construction during 8th 5-year plan,this paper discusses the strategy of the water conservancy development of the Yangtze valley.
Keywords:Waterpower resources planning Water conservancy construction River regulaton measure Yangtze River Basin  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号