首页 | 本学科首页   官方微博 | 高级检索  
     

人工再生顶板大跨度切眼联合支护技术
引用本文:叶定阳,刘长武,刘洋,何涛.人工再生顶板大跨度切眼联合支护技术[J].金属矿山,2014,43(2):55-58.
作者姓名:叶定阳  刘长武  刘洋  何涛
作者单位:1.水力学与山区河流开发保护国家重点实验室,四川 成都 610065;2.四川大学水利水电学院, 四川 成都 610065
基金项目:国家自然科学基金项目(编号:51134018,50879049),国家重点基础研究发展计划(973计划) 项目(编号:2010CB226802)。
摘    要:在人工再生顶板大跨度切眼支护中,由于巷道地质条件复杂,矿压显现严重,且随着地压和巷道断面的增大,存在一般锚网索支护难以克服的困难。根据人工再生顶板巷道的地质特点及矿压显现特征,在大断面人工再生顶板条件下采用"木架棚+锚索"联合支护。此种支护结合主动支护和被动支护的优点,减少顶板离层冒落,实现了对大断面切眼的有效控制,防止了切眼强烈变形、断裂,保持了切眼的稳定性,达到了良好的支护效果,为人工再生顶板下的煤炭开采提供了可靠的安全保证。在充填开采下,采用钢梁和单体液压支柱不便于回收,而木材价格低廉,减少了支护材料的丢失浪费,取得了显著的经济效益。"木架棚+锚索"联合支护技术对于充填开采大跨度巷道具有借鉴作用。

关 键 词:充填开采  人工再生顶板  联合支护  大跨度切眼

Application of Combined Support Technology in Large Span Open-off Cut under Artificial Regenerated Roof
Ye Dingyang,Liu Changwu,Liu Yang,He Tao.Application of Combined Support Technology in Large Span Open-off Cut under Artificial Regenerated Roof[J].Metal Mine,2014,43(2):55-58.
Authors:Ye Dingyang  Liu Changwu  Liu Yang  He Tao
Affiliation:1.State Key Laboratory of Hydraulics and Mountain River Engineering,Chengdu 610065 ,China;2.College of Water Resource and Hydropower,Sichuan University,Chengdu 610065,China;
Abstract:In large span open-off cut under artificial regenerated roof,due to roadway complicated geological conditions,mine pressure appear serious.With the pressure and the section of roadway increasing,there is a difficulty that common anchor net and rope can′t overcome.According to the geological characteristics and ground pressure characteristics of roadway,a combined support of wooden shed and anchor is used in large section of artificial regenerated roof.Such support combined the passive and active support′s merits.It reduced the roof separation and falling, achieved the effective control to the large span open-off,prevented the cut deformation and rupture and maintained the stability of the cut.Also,it provided a reliable guarantee for the mining of coal under artificial regenerated roof.It is not easy to cyclically reuse steel beams and single hydraulic in backfill mining.But due to cheap prices,the use of wooden materials reduced supporting material loss and waste,which achieved remarkable economic benefits.The joint support of wooden shed and anchor can be used in backfill mining of large span tunnel for reference.
Keywords:Backfill mining  Artificial regenerated roof  Joint support technology  Large span open-off cut
本文献已被 CNKI 等数据库收录!
点击此处可从《金属矿山》浏览原始摘要信息
点击此处可从《金属矿山》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号