首页 | 本学科首页   官方微博 | 高级检索  
     

中型水库挑流消能工原型试验与验证
引用本文:付希文,高文红.中型水库挑流消能工原型试验与验证[J].吉林水利,2011(11):26-29.
作者姓名:付希文  高文红
作者单位:吉林省水利水电勘测设计研究院;吉林省通榆县向海水库管理处;
摘    要:采用挑流消能工,在我省大中型水库泄洪消能中已被广泛应用,实践证明效果良好。多年来,我们对省十余水库工程中的泄洪洞挑流消能工程进行了原型观测及室内模型试验。本文拟以海龙水库泄洪模型试验为例,对软基挑流消能问题做分析讨论,愿与同行交流,以求共勉。

关 键 词:泄洪洞  软基挑流消能  原型观测  室内模型试验

Medium-sized reservoirs trajectory dissipator prototype testing and verification
Fu Xi-wen,Gao Wen-hong.Medium-sized reservoirs trajectory dissipator prototype testing and verification[J].Jilin Water Resources,2011(11):26-29.
Authors:Fu Xi-wen  Gao Wen-hong
Affiliation:Fu Xi-wen,Gao Wen-hong
Abstract:The trajectory dissipators have been applied widely in medium and large-sized reservoirs in Jilin province,the practice has proved they are effective.Over the years,more than ten reservoir spillway trajectory energy dissipators have been carried out prototype observation and indoor model test.This paper taking Hailong Reservoir spillway model as an example,analysed and discussed the issues of soft ground trajectory dissipator and willing to work with peers in order to encourage each other.
Keywords:spillway  soft ground trajectory energy dissipation  prototype observation  indoor model test  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号