首页 | 本学科首页   官方微博 | 高级检索  
     


Further study of minimizing total tardiness for the worker assignment scheduling problem in the identical parallel-machine models
Authors:Po-Chieng Hu
Affiliation:(1) Department of Industrial Management, National Formosa University, Yunlin, Taiwan, 632
Abstract:Minimizing total tardiness in the model of an identical parallel-machine with nonpreemptive jobs of the worker assignment scheduling problem is further studied in this paper. More complicated simulation processes are established for this purpose. The specific worker assignment scheduling problem is solved in two parts of job scheduling and worker assignment. The S_PT, E_DD, S_lack (SES) heuristic is used for the job scheduling part while the largest marginal contribution (LMC) procedure is used to for the worker assignment part and then minimizes the total tardiness. From the new simulations conducted, the heuristics developed have again shown very convincing results quite efficiently.
Keywords:LMC procedure  SES heuristic  Simulation   Total tardiness  Worker assignment scheduling problem
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号