首页 | 本学科首页   官方微博 | 高级检索  
     

考虑增量用电负荷分配的煤改电/煤改气联合分阶段规划
引用本文:杨 楠,隆舰艇,黄悦华,袁 伟,刘颂凯,邢 超,张 磊.考虑增量用电负荷分配的煤改电/煤改气联合分阶段规划[J].电力系统保护与控制,2020,48(17):55-67.
作者姓名:杨 楠  隆舰艇  黄悦华  袁 伟  刘颂凯  邢 超  张 磊
作者单位:三峡大学电气与新能源学院,湖北 宜昌 443002;国家能源集团荆门发电有限公司,湖北 荆门 448000;云南电网有限责任公司电力科学研究院,云南 昆明 650217
基金项目:国家自然科学基金项目资助(51607104);国家电网有限公司科技项目资助(SDHZ2018112)
摘    要:随着我国供暖改造规模的不断扩大,如何根据各种供暖方式的优势及特点研究最优的清洁化供暖改造方案对于我国能源结构转型,缓解环境危机具有重要意义。提出了一种考虑增量用电负荷分配的"煤改电"、"煤改气"联合分阶段规划方法。首先,基于发电能源结构和清洁能源实际发电量构建了"煤改电"增量用电负荷分配模型,精细化分析"煤改电"产生的新增电量。然后,以"煤改电"、"煤改气"分阶段改造方案为决策变量,以用户供暖支出的经济成本、供暖改造的环境成本和能源成本为优化目标,构建"煤改电"、"煤改气"联合分阶段规划模型。最后,利用向量序优化算法对模型进行求解。仿真结果验证了所提方法的正确性和有效性。

关 键 词:"煤改电"和"煤改气"  增量用电负荷分配  联合分阶段规划  向量序优化
收稿时间:2019/10/25 0:00:00
修稿时间:2020/1/13 0:00:00

Joint staged planning of coal-to-electricity/coal-to-gas considering incremental electricity load distribution
YANG Nan,LONG Jianting,HUANG Yuehu,YUAN We,LIU Songkai,XING Chao,ZHANG Lei.Joint staged planning of coal-to-electricity/coal-to-gas considering incremental electricity load distribution[J].Power System Protection and Control,2020,48(17):55-67.
Authors:YANG Nan  LONG Jianting  HUANG Yuehu  YUAN We  LIU Songkai  XING Chao  ZHANG Lei
Affiliation:1. College of Electrical Engineering and New Energy, Three Gorges University, Yichang 443002, China; 2. National Energy Group Jingmen Power Generation Co., Ltd., Jingmen 448000, China; 3. Electric Power Research Institute, Yunnan Power Grid Co., Ltd., Kunming 650217, China
Abstract:With the continuous expansion of the scale of heating transformation in China, it is of great significance to study an optimal clean heating transformation scheme according to the advantages and characteristics of various heating modes for the transformation of energy structure and mitigation of an environmental crisis. In this paper, a joint staged planning method of "coal-to-electricity" and "coal-to-gas" considering incremental electricity load distribution is proposed. First, based on the energy structure of power generation and the actual power generation of clean energy, an incremental load distribution model of "coal to electricity" is constructed to analyze the incremental power generated by "coal to electricity" in detail. Then, taking the staged planning schemes of "coal-to-electricity" and "coal-to-gas" as decision variables, and taking the economic cost of user heating expenditure, the environmental and energy cost of heating reconstruction as optimization objectives, a joint staged planning model of "coal-to-electricity" and "coal-to-gas" is established. Finally, the model is solved by a vector order optimization algorithm. The correctness and validity of the proposed method are verified by the simulation results. This work is supported by National Natural Science Foundation of China (No. 51607104) and Science and Technology Project of State Grid Corporation of China (No. SDHZ2018112).
Keywords:"coal-to-electricity" and "coal-to-gas"  incremental electricity load distribution  combined staged planning  vector order optimization algorithm
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《电力系统保护与控制》浏览原始摘要信息
点击此处可从《电力系统保护与控制》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号