首页 | 本学科首页   官方微博 | 高级检索  
     

某工程高耸钢结构安装技术
引用本文:王宪璋,伍星平.某工程高耸钢结构安装技术[J].施工技术,2009(Z1).
作者姓名:王宪璋  伍星平
作者单位:中国新兴建设开发总公司;新疆石油管理局;
摘    要:介绍新疆石油管理局生产调度指挥中心工程100m高耸钢结构的施工技术。钢筒散件运输至现场,分段在地面组拼后采用750 t履带式起重机依次吊装就位。重点阐述了钢筒组拼平台做法、组拼精度保证措施、吊装工艺、大型履带式起重机使用注意事项等。

关 键 词:钢结构  吊装  钢筒  施工  

Installation Technology of Steel Structure in Some Tower
Wang Xianzhang,Wu Xingping.Installation Technology of Steel Structure in Some Tower[J].Construction Technology,2009(Z1).
Authors:Wang Xianzhang  Wu Xingping
Affiliation:1.China Xinxing Construction & Development General Co.;Beijing 100039;China;2.Xinjiang Petroleum Administration;Kelamayi;Xinjiang 834000;China
Abstract:The construction technology of some steel structure with 100m height in Xinjiang Petroleum Administration is introduced in detail in this paper.The steel tube is transported to field separately firstly and are assembled in subsection,and then they are hoisted to emplacement by 750t crawler crane.The practice of steel tube assembly platform,assurance measures of assembly precision,hoisting technology and the points for attentions of crawler crane are described.
Keywords:steel structure  hoisting  steel tube  construction  