首页 | 本学科首页   官方微博 | 高级检索  
     


Application of step‐response test for evaluation of uncertainty of standard measuring system for lightning‐impulse high voltage
Authors:Satoru Miyazaki  Hisashi Goshima  Takaaki Amano  Hiroyuki Shinkai  Masafumi Yashima  Takayuki Wakimoto  Masaru Ishii
Affiliation:1. Central Research Institute of Electric Power Industry, Japan;2. Chiba Institute of Technology, Japan;3. University of Tokyo, Japan
Abstract:In evaluating the uncertainty of the standard measuring system for lightning‐impulse high voltages, which is composed of a standard voltage divider, a digital recorder, and calibrators, step‐response tests of the standard voltage divider may be useful. In this paper, a convolution algorithm is employed to calculate the output impulse voltage waveforms from measured step‐response waveforms. The uncertainties of peak‐value measurement due to the influence of the nominal epoch, uncertainty of the peak‐value measurement due to dispersion of the AC scale factor, and uncertainty of the virtual front‐time measurement due to long‐term stability are evaluated. Furthermore, the error of the virtual front time of the output waveforms is discussed. The front part of the step‐response waveform, tT30%, does not influence the error of the virtual front time. Therefore, for the standard voltage divider, the step‐response parameters, that is, the experimental response time, partial response time, settling time, and overshoot, have almost nothing to do with the error of the virtual front time. © 2012 Wiley Periodicals, Inc. Electr Eng Jpn, 180(2): 24–32, 2012; Published online in Wiley Online Library ( wileyonlinelibrary.com ). DOI 10.1002/eej.21279
Keywords:voltage divider  step‐response test  lightning impulse voltage  peak value  front time  uncertainty  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号