Department of Industrial and Manufacturing Engineering Oregon State University, Corvallis, Oregon 97331-2407, USA
Abstract:
A decision aid for scheduling production in glass fiber manufacturing industry is described. The methodology combines a linear programming (LP) optimization model with a heuristic model. The LP model determines production goals; the heuristic model then uses the LP output to incorporate system-specific constraints in developing processing sequences.