首页 | 本学科首页   官方微博 | 高级检索  
     

小汪沟铁矿露天转地下覆盖层形成方法研究
引用本文:李楠,任凤玉,赵云峰,常帅. 小汪沟铁矿露天转地下覆盖层形成方法研究[J]. 金属矿山, 2010, 39(12): 9-11
作者姓名:李楠  任凤玉  赵云峰  常帅
作者单位:1.东北大学;2.西林钢铁集团灯塔矿业公司
摘    要:
小汪沟铁矿在露天转地下开采过程中,采用诱导边坡岩体自然冒落的方法形成覆盖层,有效地扩展了露天与井下同时生产的空间条件,实现了露天转地下增产衔接。详细介绍诱导冒落方案、工艺技术与实施效果,并分析了影响冒落进程的主要因素。

关 键 词:露天转地下  覆盖层  诱导冒落  

Study on the Formation of Overburden Layer during the Transition from Open-pit to Underground Mining in Xiaowanggou Iron Mine
Li Nan,Ren Fengyu,Zhao Yunfeng,Chang Shuai. Study on the Formation of Overburden Layer during the Transition from Open-pit to Underground Mining in Xiaowanggou Iron Mine[J]. Metal Mine, 2010, 39(12): 9-11
Authors:Li Nan  Ren Fengyu  Zhao Yunfeng  Chang Shuai
Affiliation:1.Northeastern University;2.Dengta Mining Company of Xilin Iron & Steel Group
Abstract:
During the transition from open-pit to underground mining in Xiaowanggou iron mine,overburden layer for sublevel caving is formed through the induced caving process of open-pit slope.This process is effective in extending space conditions of simultaneous open-pit and underground mining,and achieving the production increase during the transition from open-pit to underground mining.The paper describes the schemes,techniques and implementation of induced caving,and analyzes the main factor of affecting the caving process.
Keywords:Transition from open-pit to underground  Overburden layer  Induced caving
本文献已被 万方数据 等数据库收录!
点击此处可从《金属矿山》浏览原始摘要信息
点击此处可从《金属矿山》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号