首页 | 本学科首页   官方微博 | 高级检索  
     

浅谈预应力混凝土箱梁冬季施工的几点措施
引用本文:邵志溥,李开煜,万明福.浅谈预应力混凝土箱梁冬季施工的几点措施[J].山西建筑,2009,35(13):140-141.
作者姓名:邵志溥  李开煜  万明福
作者单位:1. 鞍山市公路管理处,辽宁,鞍山,114004
2. 鞍山市公路勘测设计院,辽宁,鞍山,114000
摘    要:结合鞍山市省道沈营线千山西路跨线桥施工工程实例,通过冬季预应力混凝土箱梁的施工、蒸汽养护等施工技术,对做好冬季施工的措施提出一些见解,从而保证工程按期完工和预制混凝土箱梁的质量。

关 键 词:混凝土箱梁  冬季  施工  养护

On several measures for winter construction of prestressed concrete box-girder
SHAO Zhi-pu,LI Kai-yu,WAN Ming-fu.On several measures for winter construction of prestressed concrete box-girder[J].Shanxi Architecture,2009,35(13):140-141.
Authors:SHAO Zhi-pu  LI Kai-yu  WAN Ming-fu
Affiliation:SHAO Zhi-pu LI Kai-yu WAN Ming-fu
Abstract:Combined with construction work of Qianshan west road overpass bridge in Shenyang-Yingkou line of provincial road in Anshan,the construction technology of prestressed concrete box-girder in winter as well as steam curing measures are introduced.Some suggestions are proposed for winter construction of concrete,which ensure on-time completion of works and the quality of prestressed concrete box-girder.
Keywords:concrete box-girder  winter  construction  curing  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号