首页 | 本学科首页   官方微博 | 高级检索  
     

斜拉桥施工张拉索力的确定
引用本文:李宏林. 斜拉桥施工张拉索力的确定[J]. 山西建筑, 2007, 33(17): 332-333
作者姓名:李宏林
作者单位:北京交通大学基建与规划处,北京,100044
摘    要:
研究以有约束正装迭代法进行施工过程中索力优化与合理施工状态确定的问题,并采用有限元分析软件AN-SYS,实现了斜拉桥施工过程的模拟计算,以推广该方法。

关 键 词:斜拉桥  合理施工状态  约束正装迭代法
文章编号:1009-6825(2007)17-0332-02
修稿时间:2007-02-09

Setting of tensioned cable force in cable-stayed bridge construction
LI Hong-lin. Setting of tensioned cable force in cable-stayed bridge construction[J]. Shanxi Architecture, 2007, 33(17): 332-333
Authors:LI Hong-lin
Affiliation:LI Hong-lin
Abstract:
In this paper, the optimum of tensioning force and the reasonable construction state are decided through restricted iterative calculation, and a simulative computation is realized of cable-stayed bridge through the finite element analysis software ANSYS, in order to popularize this method.
Keywords:cable-stayed bridge   reasonable construction state   restricted iterative calculation
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号