首页 | 本学科首页   官方微博 | 高级检索  
     

建设工程领域新型替代性纠纷解决机制研究
引用本文:何建宏,王军,温修春,赵霞.建设工程领域新型替代性纠纷解决机制研究[J].工程管理学报,2018,0(4):16-020.
作者姓名:何建宏  王军  温修春  赵霞
作者单位:1,2,3. 江苏大学 土木工程与力学学院; 4. 江苏立信建设工程造价咨询有限公司
摘    要:我国建设纠纷诉讼成本高、效率低、周期长且现有的替代性纠纷解决方式普及率低、适用范围小,亟需构建建设工程替代性纠纷解决机制。为此,总结国际工程领域常见的替代性纠纷解决机制,比较不同方式的优点与不足。基于我国一般建设工程项目纠纷的争议焦点分析,结合现有的争议评审小组、争议评审委员会、监理工程师决定、早期中立人评估和争议裁决委员会等国内外纠纷解决机制,提出新型替代性纠纷解决机制——中立人咨询小组,并阐述中立人咨询小组的调解规则和优点。以期为减轻诉讼压力,节约司法资源,快速、高效、经济、公正、和谐地解决建设工程纠纷提供新渠道。

关 键 词:建设工程  替代性纠纷解决机制  争议评审小组  中立人咨询小组

Research on Alternative Dispute Resolution of Construction Projects
HE Jian-hong,WANG Jun,WEN Xiu-chun,ZHAO Xia.Research on Alternative Dispute Resolution of Construction Projects[J].Journal of Engineering Management,2018,0(4):16-020.
Authors:HE Jian-hong  WANG Jun  WEN Xiu-chun  ZHAO Xia
Affiliation:1,2,3. Faculty of Civil Engineering & Mechanics,Jiangsu University; 4. Jiangsu Lixin Construction Engineering Cost Consulting Co. Ltd.
Abstract:Construction dispute litigation in China faces the problems of high cost,low efficiency and long period. Moreover,existing alternative dispute resolution methods have a low popularization rate with a small scope of application. Therefore, it isurgent to set up a new alternative dispute resolution suitable for construction engineering in China. This paper summarizes thecommon alternative dispute resolution mechanisms in the field of international construction practice and compares the advantagesand disadvantages of different methods. By combining current dispute review group,dispute review board,supervisory engineer’sdecision,early neutral evaluation,dispute adjudication board and other dispute resolution mechanisms at home and abroad,a newalternative dispute resolution mechanism——neutral advisory group is proposed based on the analysis of the dispute occurred inconstruction projects in China. The findings of this study can reduce litigation pressure,save social resources,and provide a newsettlement to solve the disputes in construction projects in a more quick,efficient,economical,fair and harmonious way.
Keywords:construction project  alternative dispute resolution  dispute review group  neutral advisory group
本文献已被 CNKI 等数据库收录!
点击此处可从《工程管理学报》浏览原始摘要信息
点击此处可从《工程管理学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号