500kV变电所投运后运行方式的探讨
引用本文:龚逊东.500kV变电所投运后运行方式的探讨[J].江苏电机工程,2005,24(1):31-33.
作者姓名:龚逊东
作者单位:无锡供电公司,江苏,无锡,214061
摘    要:随着500kV电网的建设,500kV变电所越来越多,电网的运行方式迫切需要认真分析,电网设备的安全性、运行的可靠性也需要仔细研究,以无锡新投产的500kV锡东南变电所为例,对其接入电网后各种运行方式进行分析探讨,提出了调度部门安排电网运行方式的一些方法与实施步骤。

关 键 词:运行方式  安全性  可靠性  分析
文章编号:1009-0665(2005)01-0031-03

Discussion of the Running Modes for 500 kV Substation
GONG Xun-dong.Discussion of the Running Modes for 500 kV Substation[J].Jiangsu Electrical Engineering,2005,24(1):31-33.
Authors:GONG Xun-dong
Abstract:With the construction of 500 kV electric power network,there are more and more 500 kV electric power substations. The running modes of electric power network require urgent and careful analysis. The security of the electric power equipment and the running reliability need further. This paper takes example of 500 kV Xidongnan electric power substation,which was plunged into running recently in Wuxi,and analyzes and discusses all kinds of the running modes after it was connected to electric power network,and puts forward some means and implementary steps of the running modes of electric power network which are arranged by the dispatch department.
Keywords:the running mode  security  reliability  analysis