首页 | 本学科首页   官方微博 | 高级检索  
     

混合云中基于截止时间和费用约束的调度方法研究*
引用本文:左利云,董守斌,舒磊.混合云中基于截止时间和费用约束的调度方法研究*[J].计算机应用研究,2016,33(8).
作者姓名:左利云  董守斌  舒磊
作者单位:广东石油化工学院 广东省石化装备故障诊断重点实验室,华南理工大学 计算机科学与工程学院,广东石油化工学院 广东省石化装备故障诊断重点实验室
基金项目:省/市自然科学基金资助项目
摘    要:针对混合云调度中私有云利用率不高和公有云费用偏高的问题,基于性能和费用目标提出了两个调度策略—截止时间优先和费用优先策略,建立了混合云中的任务和资源模型,能够根据用户提交的任务需求自适应选择合适的调度资源,对截止时间要求比较高的任务可以优先调度至公有云,对费用要求高的任务可以优先调度至私有云,而且两种策略均满足截止时间和一定的费用约束,因此相对于其它类似的基准调度方法,本文的两种调度策略在调度完成时间、费用、截止时间超出率和私有云利用率等方面均有很好的表现,尤其是当任务量比较大的时候,两种调度策略表现出更好的自适应性和优势。

关 键 词:混合云  资源利用率  任务调度  截止时间  费用约束
收稿时间:2015/4/16 0:00:00
修稿时间:6/6/2015 12:00:00 AM

Resource Scheduling Methods Based on Deadline and Cost Constraint in Hybrid Cloud
Li-yun ZUO,Shoubin Dong and Lei Shu.Resource Scheduling Methods Based on Deadline and Cost Constraint in Hybrid Cloud[J].Application Research of Computers,2016,33(8).
Authors:Li-yun ZUO  Shoubin Dong and Lei Shu
Affiliation:Guangdong University of Petrochemical Technology,Guangdong Province Key Laboratory of petrochemical equipment fault diagnosis,Maoming Guangdong,Computer Network Key Lab,School of Computer Science and Engineering,South China University of Technology,Guangzhou Guangdong,Guangdong University of Petrochemical Technology,Guangdong Province Key Laboratory of petrochemical equipment fault diagnosis,Maoming Guangdong
Abstract:In hybrid clouds, private clouds are underutilized and public clouds are expensive. Aiming at mitigating these two problems, we propose two scheduling strategies (i.e., Time-First and Cost-First) based on performance and cost objectives. Time-First and Cost-First allow tasks to choose the appropriate scheduling resources to meet user demands. In particular, the task with precedence deadline can preferentially select public cloud, and the task demanding low cost can choose private cloud with priority. Both Time-First and Cost-First satisfy the constraint conditions of the deadline and cost. Experiments demonstrate that Time-First and Cost-First achieve good performance with respect to the completion time, the cost, the deadline time and the utilization rate of private cloud, compared with other similar scheduling methods. Especially when there are a lot of tasks, Time-First and Cost-First show better adaptability and have superiority relative to standard scheduling methods.
Keywords:Hybrid cloud  Resource utilization  Task scheduling  Deadline  Cost constraint
点击此处可从《计算机应用研究》浏览原始摘要信息
点击此处可从《计算机应用研究》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号