首页 | 本学科首页   官方微博 | 高级检索  
     


Simultaneous regular and non-regular production scheduling of multipurpose batch plants: A real chemical–pharmaceutical case study
Affiliation:1. INESC TEC, Rua Dr. Roberto Frias, Porto, Portugal;2. Centro de Estudos de Gestão, Instituto Superior Técnico, Universidade de Lisboa, Av. Rovisco Pais, Lisboa, Portugal;3. Faculdade de Engenharia da Universidade do Porto, Rua Dr. Roberto Frias, Porto, Portugal
Abstract:Regular and non-regular production can often be found in multipurpose batch plants, requiring two distinct operating strategies: campaign and short-term production. This paper proposes a solution approach for simultaneous scheduling of campaign and short-term products in multipurpose batch plants. Regular products follow a cyclic schedule and must cover several product deliveries during the scheduling horizon, while non-regular products have a non-cyclic schedule. The proposed approach explores the Resource-Task Network (RTN) discrete-time formulation. Moreover, a rolling horizon approach, and reformulation and branching strategies have been applied to deal with the computational complexity of the scheduling problem. Real case instances of a chemical–pharmaceutical industry are solved, showing the applicability of the solution approach.
Keywords:Multipurpose batch plants  Campaign and short-term scheduling  Rolling horizon  MILP models  Resource-Task Network
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号