首页 | 本学科首页   官方微博 | 高级检索  
     


Decision trees aided scheduling for firm power capacity provision by virtual power plants
Affiliation:1. School of Electrical Engineering & Information Technology, Sichuan University, Chengdu 610065, Sichuan Province, China;2. Intelligent Electric Power Grid Key Laboratory of Sichuan Province, Chengdu 610065, Sichuan Province, China;1. Department of Radiology, Samsung Medical Center, Seoul, Korea;2. Division of Hematology-Oncology, Department of Internal Medicine, Samsung Medical Center, Seoul, Korea;3. Department of Pathology, Samsung Medical Center, Seoul, Korea;4. Department of Radiology, Soonchunhyang University Seoul Hospital, Soonchunhyang University School of Medicine, Seoul, Korea;5. Sungkyunkwan University School of Medicine, Seoul, Korea;1. School of Management, Hefei University of Technology, Hefei 230009, China;2. Key Laboratory of Process Optimization and Intelligent Decision-Making, Ministry of Education, Hefei 230009, China;3. Qingdao Power Supply Company Control Center, Shandong Electric Power Group, Qingdao 266300, China;4. Hunan Electric Power Corporation Research Institute, State Grid Corporation, Anti-Icing and Reducing-Disaster Technology, Key Laboratory of Power Transmission and Transformation Equipments, Changsha 410007, China;1. Shenzhen Key Laboratory of Electromagnetic Control, Shenzhen University, Shenzhen, Guangdong Province, PR China;2. Department of Electrical Engineering, Hong Kong Polytechnic University, Hong Kong, China
Abstract:The incorporation of Distributed Generation (DG) under the Virtual Power Plant (VPP) concept allows the market integration of several and largely dispersed electric power sources. One matter of concern for the VPP owner and operator is to follow the hourly schedule regardless of the stochastic nature of some of its sources or any unpredicted generation outages. This study presents a Decision Tree (DT) based methodology that prepares for the dispatching of power equivalent to the possible loss of the highest injection of one of the sources of the VPP (according to day-ahead hourly schedule) to the rest of its sources, on an hour-ahead horizon. This allows VPP operators to provide firm capacity and participate effectively in the energy market.
Keywords:Decision trees  Distributed generation  Firm power capacity  Virtual power plant
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号