首页 | 本学科首页   官方微博 | 高级检索  
     

输油管线停输期间开泵顶管时间周期的确定
引用本文:王立志.输油管线停输期间开泵顶管时间周期的确定[J].当代化工,2002,31(1):22-23,36.
作者姓名:王立志
作者单位:中国石油抚顺石化分公司,辽宁,抚顺,113008
摘    要:对于间断性输送高凝点石油产品 ,在停输时间较长的情况下 ,为避免油品凝结 ,需定时开泵进行顶管。为减少操作频次 ,节约能量消耗 ,通过对管线油品温降的计算和分析 ,可以比较精确地测算出输油管线温降规律 ,从而确定停输期间开泵顶管的时间周期 ,为生产实际提供理论依据

关 键 词:管线  温降  顶管  周期
文章编号:1671-0460(2002)01-022-03

Confirmation of Time Cycle to Operate Pump for Propel During Stopping Transportation
WANG,Li-zhi.Confirmation of Time Cycle to Operate Pump for Propel During Stopping Transportation[J].Contemporary Chemical Industry,2002,31(1):22-23,36.
Authors:WANG  Li-zhi
Abstract:When transporting high freezing point oil products discontinualy, to avoid oil products coagulating, it's necessary to operate pump for propel in time in the long time of stopping transportation. In order to reduce operating time, save energy consumption, the regulation of temperature decline in pipeline can be calculated accurately by calculation and analysis for the temperature decline of oil product. Time cycle to operate pump during stopping transportation can be confirmed and theory basis is applied for production.
Keywords:Pipeline  Temperature decline  Propel  Cycle  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号