古交电厂600MW汽轮机中压缸启动
引用本文:吴作明. 古交电厂600MW汽轮机中压缸启动[J]. 山西能源与节能, 2012, 0(1): 68-69,72
作者姓名:吴作明
作者单位:山西古交电厂,山西太原,030206
摘    要:
结合东方汽轮机厂CLN600-24.2/566/566型超临界汽轮机组在古交电厂顺利投产,叙述了山西古交电厂600MW超临界机组汽轮机中压缸启动过程中操作步骤和方法,以及在操作过程中需要注意的问题。

关 键 词:超临界  汽轮机  中压缸启动

Intermediate Pressure Cylinder Start Process for 600MW Unit in Gujiao Power Plant
WU Zuo-ming. Intermediate Pressure Cylinder Start Process for 600MW Unit in Gujiao Power Plant[J]. Shanxi Energy and Conservation, 2012, 0(1): 68-69,72
Authors:WU Zuo-ming
Affiliation:WU Zuo-ming (Shanxi Electric Power Survey and Design Institute ,Taiyuan 030001,Shanxi, China)
Abstract:
Combined with CLN600-24.2/566/566 supercritical steam turbine made by Dongfang steam turbine plant in Gujiao plant, steps and methods in the intermediate pressure cylinder start process for 600 MW unit in Gujiao power plant, as well as problems that need attention during the operation were discussed.
Keywords:supercritical  turbine  intermediate pressure cylinder start